6500 TPD Gold and Silver Ore Processing and Recovery Plant ID: 230471


The 6500 TPD ore processing plant at Goldcorp’s Marlin Mine has a traditional hydrometallurgical design for the treatment of ore containing gold and silver. The operation of the plant was performed through 5 main processes with each having the necessary equipment for efficient function. A filter plant was installed for dry stack tailings.

The plant was designed to treat approx. 6500 tons per day, depending on type of ore being processed. Capacity varied between 5000 and 7500 TPD.

Savona Equipment Ltd. has signed a joint venture agreement with Continental Drilling S.A. to sell the Marlin Mine assets. As the authorized broker for the assets, we invite you to contact us directly for more information and pricing.

The complete plant includes the following processes:

 

  1. Size reduction.
  2. Gravity Circuit
  3. Leaching in tanks.
  4. Gold & Silver recovery.
  5. Tailings treatment.

 

6500 TPD Gold and Silver Processing and Recovery Plant Equipment:

  • BTI Rock Breaker w. Hydraulic Controls and Control Room
  • Metso Apron Feeder
  • Metso Vibrating Grizzly Feeder
  • Nordberg C125 Jaw Crusher
  • Stacking Conveyor to Sag Mill Tunnel Feeder + Feed Conveyor
  • Hardinge SAG Mill 6.4m Dia x 3.35m EGL (21 ft. x 11 ft.)
  • Terex Vibrating Pan Feeder
  • Sag Mill Return Conveyor
  • Fuller Traylor Ball Mill 4.88m dia x 7.47m EGL (16 ft. x 24 ft.)
    • Complete Spare Mill Available
  • 2 x Weir (Warman) Cyclone Feeding Pumps
  • 6 x Weir (Warman) 15 in. Cyclones
  • Sepro Falcon SB2500 Centrifugal Gravity Concentrator
  • Gekko ILR Inline Leach Reactor
  • Outotec 25m Dia High Rate Grinding Thickener
  • 2 x Weir (Warman) 16 x 10 x 18 Slurry Pumps
  • 6 x Outotec 23m Dia High Rate CCD Thickeners with Hyd. Lift
  • 5 x Weir (Warman) 16 x 10 x 18 Centrifugal Pumps
  • Goulds 12 x 10 x 16 Centrifugal Pump
  • Rich Solution Tank 10m dia x 7.7m H
  • 6 x Leach Tanks with Lightnin Mixers
    • 16.8m Dia x 17.5m H. Tanks
    • Dual Impeller, Rubber Lined, Air Sparge Down Shaft
  • 2 x Agitator Neutralization Tanks and Mixers with Hansen Reducers
  • Lime System with Silos, Grinding Mill, Tanks, Pumps, etc.
  • Process Water Tank 12m Dia x 12m H
  • 2 x Agitator Neutralization Tanks
  • Merrill Crowe System
  • 3 x Whittier Pressure Leaf Filter Clarifiers, 174.6 m2 each.
  • 2 x Goulds Precipitator Feed Pump 8 x 10 x 16
  • 3 x J-Press Precipitator Filter Presses with Recessed Plate Filters, 186 m2 Each.
  • 2 x Summit Valley Mercury Retort Dryers
  • 2 x Atlas Copco Neutralization Blower
  • 4 x Atlas Copco Process Air Compressors
  • 2 x 69000 Volt GE Transformers

 

Metso Filter Plant for Dry Stack Tailings:

  • Automated Controls with Control Room or Manual Controls at Machine
  • Outotec 24m Dia Paste Thickener
    • High Capacity
    • Hydraulic Raise
  • 2 x Filter Feed Tanks with Lightnin Mixers
    • Single Stage
    • 4.2m Dia.
  • 2 x Weir (Warman) Thickener Pumps
  • 8 x Metso VPA 240-54 Pressure Filters
  • 2 x Weir (Warman) 6/4 FHH Primary Filter Feed Pumps
  • 16 x Weir (Warman) CCAH 3 x 2 Secondary Filter Feed Pumps
  • 2 x Tipic 12m Dia. X 13m High Filter Feed Tanks with Agitators
  • 2 x Conveyor Engineering 900mm Wide Filtered Material Conveyors to Filter Cake A-Frame Storage Building
  • 3 x Atlas Copco Compressors

 

Additional Equipment Available:

  • 5 MW Cat Standby Generator
    • Cooling Station
    • Transformers
  • Eurostar Concrete Technology S.p.A Shotcrete Plant
  • Concrete Batch Plant
  • Spares for Processing, Recovery, and Filter Plant Equipment
  • Underground Mining Equipment 

 

Image 1 of 45

    Get Quote

    Get Equipment Quote

    Full Name
    Email Address
    Phone
    Questions, Informations and Comments
    Project Location